1. Pre qualification
Engineer (E): Good morning, first let me introduce myself. My name id David Lee, a Consultant Engineer
of Da Long Power Station Company Limited. I am glad to meet you.
Contractor (C): Good morning, Nice to meet you too. I am Wang hai. I work for CSCEC Corporation as the
representative of the contractor for the civil works.
E: Today, as a representative of the owner of the Power Station, I would like to thank you for your attendance
at the presentation meeting. In this way we hope we can have the chance to learn more about
your company’s capacity for power plant construction.
C: Thank you for offering this opportunity to our company. We are very interested in this project and hope
to be qualified for tendering for this project.
E: Now let me introduce the project briefly though it has been mentioned in the Prequalification Document
which was issued to you a few days age. Do Long Power station is a coal fired power station
with 2 units of 600MW turbine generators. This project is financed by the World Bank and
implemented through an international tendering procedure. The construction period from the
piling works to generating power by the first unit is 30 months and the quality must be complied
with advanced international standard.
C: That means this project is really challenge to us and we will have very hard competition in tendering.
E: You are right. So you should pass the prequalification procedure first. Now let’s go on. The power
station is located in kuanning Province of Annoi. The general geological information is
mentioned in the document but not in much detail because in next stage, the tendering stage,
more detailed information will be provided. Now, could you give me an introduc
《建筑施工实用英语会话》 来自淘豆网www.taodocs.com转载请标明出处.