260. C, Final inspection (Finished goods inspection) :
As the "final inspection," the quality indexes of galvanized of inspection and finished packing sampling, c、最终检验(成品检验):简称“终检”,镀锌各项质量指标的检查,以及包装成品进行抽样
It will prehensive inspection to mark, quality and quantity. 对标识、质量、数量的综合性检查。
Explanation: 1,Above the inspection process when the inspectors have discovered the problem and notify the main operator or his superiors, but the main operator not take corrective measures timely. The main operator will undertake all of the flawed loss. 1、以上检验过程中若检验员已经发现问题并通知主操手或其上级,而主操手没有及时采取纠正措施,所有不合格损失由主操手全部承担。
2,As if the main operator is not abide by operating procedures and other standards to produce, the inspectors have the right to refuse inspection and forces to determine the quantities of products is not qualified. The main operator will undertake all losses. 2、若主操手未按操作规程等标准要求进行生产,检验员有权拒绝巡检,并强制判定批量产品为不合格品,所有损失由主操手承担。
item of quality inspection department质检部检验项目
262. Standards introduced标准介绍
Standard is standardized,Every country and department has its ,The standard that monly used in the pacific business has the following kinds: 标准就是规范,每个国家和部门都有自己的标准。目前,我们在平时的业务中最常用到的标准有以下几种:
GB-China's national standard (GB) ANSI-the American national standards (Americanstandard) GB—中国国家标准(国标) ANSI—美国国家标准(美标)
DIN-the German national standard (German standard) ASME-the
铁塔基础知识260-269microsoft word 文档 来自淘豆网www.taodocs.com转载请标明出处.